Home (CZ) | PL | SK | DE | EN | RU
Video
Reference
We are very satisfied with the result. The design is already showing that short, efficient assembly time will be absolutely feasible. We ascertained these results not just in theory but very vividly with a 3P (Production Preparation Process) workshop. The design’s good momentum will also flow into a follow-up project.
Elmar Stichlmair, Consultant Engineering Assembly Civil Programmes, MTU Aero Engines

LEAN Prague Spring 2014

LEAN INTERNATIONAL CONFERENCE, Lean Fabrika

 MEZINÁRODNÍ KONFERENCE LEAN, Lean Fabrika